5 active projects totalling 940.4 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

5active projects
940.4active MW
6total filed
Queue IDProjectkVMWResourceStatus
22INR0332 Brantley Branch Batt 345 302.4 Battery SS Completed, FIS Started, No IA
25INR0284 Railway BESS n/r 254.8 Battery Inactive
25INR0591 Zeus Rusk BESS 345 208.8 Battery SS Completed, FIS Started, No IA
27INR0488 Dry Creek Solar II 345 201.3 Solar SS Completed, FIS Completed, No IA
23INR0286 Dry Creek Solar I 345 201.1 Solar SS Completed, FIS Completed, IA
25INR0590 Zeus Rusk Solar 345 26.8 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.