5 active projects totalling 942.5 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

5active projects
942.5active MW
6total filed
Queue IDProjectkVMWResourceStatus
22INR0332 Brantley Branch Batt 345 302.4 Battery SS Completed, FIS Started, No IA
25INR0284 Railway BESS n/r 254.8 Battery Inactive
25INR0591 Zeus Rusk BESS 345 208.8 Battery SS Completed, FIS Started, No IA
27INR0488 Dry Creek Solar II 345 203.4 Solar SS Completed, FIS Started, No IA
23INR0286 Dry Creek Solar I 345 201.1 Solar SS Completed, FIS Completed, IA
25INR0590 Zeus Rusk Solar 345 26.8 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.