Rusk, TX interconnection queue

1 active project totaling 200 MW in the SPP queue.

1active projects
200active MW
1total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-081 Not reported 345 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.