Oak Spring
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Nolan County. First named in the release with data as of October 1, 2025.
Nolancounty as printed
138kV
ONCORutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Nolan, TX: ERCOT queue, 18 active of 18. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Add Permian Basin Reliability Plan Upgrade ID L25D and L25E. Add Permian Basin Reliability Plan Upgrade ID L25D and L25E. Build Oak Spring - Plowboy 138-kV line. Move the Eskota 138/69-kV transformer 1 to Plowboy. ERCOT project 99357 · utility no. R8805 |
ONCOR Tier 2 |
Planned Future tab |
138 | Sep 2028 | Oak Spring to Plowboy Nolan County |
Oak Spring, Plowboy |
| Sweetwater Creek POI - Eskota 69 kV line and convert to 138 kV Rebuild the Sweetwater Creek POI - Eskota 69 kV line and convert to 138 kV approved as part of the 24RPG040 Oncor Roscoe Area Upgrades Project. ERCOT project 99359 · utility no. R9000 · RPG 24RPG040 |
ONCOR Tier 2 |
Planned Future tab |
138 | Dec 2028 | Eskota to Oak Spring Nolan County |
Eskota, Oak Spring |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 99357 | Projected in-service date | May 2028 → Sep 2028 |
| October 1, 2025 | 99357 | First listed | on the Future tab |
| October 1, 2025 | 99359 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner