PH Robinson

Named in 10 listed projects in ERCOT’s transmission project tracking workbook, in Galveston County. First named in the release with data as of February 1, 2015.

Galvestoncounty as printed
138, 345kV
CNP, TNMPutility
10projects listed

A HIFLD substation record has the same name and county: PH ROBINSON (GALVESTON County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Galveston, TX: ERCOT queue, 11 active of 13. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
CEHE Upgrades as part of TNMP's Galveston Region Project
Install new 138kV PH Robinson to TNMP-Hidden Lakes tie-line.
ERCOT project 103006A · RPG 24RPG039
CNP
Tier 3
Planned
Future tab
138 Dec 2028 PH Robinson to TNMP-Hidden Lakes
Galveston County
PH Robinson, Hidden Lakes
PH Robinson to WA Parish Hardening 25RPG028
Rebuild and reconductor Ckt.99A PH Robinson to Meadow as a Hardening upgrade
ERCOT project 103344A · RPG 25RPG028
CNP
Tier 4
Planned
Future tab
345 Dec 2028 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow
PH Robinson to WA Parish Hardening 25RPG028
Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits.
ERCOT project 103344B · RPG 25RPG028
CNP
Tier 4
Planned
Future tab
345 Dec 2028 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow
PH Robinson to Algoa Corner P1056 Hardening (26RPG020)
Rebuild/reconductor portions of Ckt.93B PH Robinson to Alta Loma as a Hardening upgrade. Increase PH Robinson Ckt.93B equipment to increase thermal limits.
ERCOT project 109648A · RPG 26RPG020
CNP
Tier 3
Planned
Future tab
138 Dec 2028 PH Robinson to Alta Loma
Galveston County
PH Robinson, Alta Loma
Rebuild Hidden Lakes-PH Robinson with bundled 795 ACSS
ERCOT project 66204
TNMP
Tier 4
Planned
Future tab
138 May 2029 TNMP Hidden Lakes (bus # 38900) to CenterPoint PH Robinson (bus # 42015)
Galveston County
Hidden Lakes, PH Robinson
PH Robinson Area 138kV Upgrades
Reposition existing PH Robinson to BACLIF generator lead from the PHR_South bus to the PHR_North bus.
ERCOT project 73352A
CNP
Tier 4
Planned
Future tab
138 Dec 2027 PH Robinson to BACLIF
Galveston County
PH Robinson, BACLIF
PH Robinson Area 138kV Upgrades
Upgrade Ckt.79F PH Robinson to Seabrook to HANNAH to HUNTER to increase thermal limits
ERCOT project 73352B
CNP
Tier 4
In-Service
Completed tab
138 Dec 2024
actual 2025-01
PH Robinson to Seabrook
Galveston County
PH Robinson, Seabrook
PH Robinson Area 138kV Upgrades
Upgrade PH Robinson 'North' Bus fault duty to 80KA
ERCOT project 73352D
CNP
Tier 4
Planned
Future tab
138 Dec 2027 PH Robinson
Galveston County
PH Robinson
Upgrade to increase thermal limits as part of FRM upgrades
Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades
ERCOT project 87479B
CNP
Tier 4
Conceptual
Current-year planned tab
345 Jul 2025 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow
Facility Ratings Methodology (FRM) Upgrades
Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades
ERCOT project 90232B
CNP
Tier 4
Planned
Future tab
345 Feb 2027 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202687479BStatus as reportedPlanned → Conceptual
July 13, 202690232BMoved between tabsCurrent-year planned → Future
July 13, 202690232BProjected in-service dateDec 2026 → Feb 2027
July 13, 2026109648AFirst listedon the Future tab
July 13, 202690232BProjected in-service dateMar 2026 → Dec 2026
June 1, 2026103006AFirst listedon the Future tab
June 1, 2026103344AFirst listedon the Future tab
June 1, 2026103344BFirst listedon the Future tab
June 1, 202690232BProjected in-service dateFeb 2026 → Mar 2026
February 1, 202690232BProjected in-service dateNov 2025 → Feb 2026
October 1, 202573352AProjected in-service dateOct 2026 → Dec 2027
October 1, 202573352DProjected in-service dateOct 2026 → Dec 2027
October 1, 202590232BProjected in-service dateJul 2025 → Nov 2025
June 1, 202573352AProjected in-service dateMay 2026 → Oct 2026
June 1, 202573352BStatus as reportedPlanned → In-Service
June 1, 202587479BMoved between tabsFuture → Current-year planned
June 1, 202590232BMoved between tabsFuture → Current-year planned
February 1, 202573352AProjected in-service dateDec 2025 → May 2026
February 1, 202573352BMoved between tabsFuture → Completed
February 1, 202573352DProjected in-service dateDec 2025 → Oct 2026
February 1, 202590232BFirst listedon the Future tab
October 1, 202466204Projected in-service dateMay 2026 → May 2029
October 1, 202487479BFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.