Meadow
Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand 345kV Meadow (MDO) substation” — project 90189, as the utility reported it
A HIFLD substation record has the same name and county: MEADOW (BRAZORIA County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| CEHE Upgrades as part of TNMP's Galveston Region Project Upgrade Meadow Auto A1 to increase thermal limits. ERCOT project 103006B · RPG 24RPG039 |
CNP Tier 3 |
Planned Future tab |
345 | Dec 2028 | Meadow Brazoria County |
Meadow |
| PH Robinson to WA Parish Hardening 25RPG028 Rebuild and reconductor Ckt.99A PH Robinson to Meadow as a Hardening upgrade ERCOT project 103344A · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | PH Robinson to Meadow Galveston / Brazoria County |
PH Robinson, Meadow |
| PH Robinson to WA Parish Hardening 25RPG028 Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits. ERCOT project 103344B · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | PH Robinson to Meadow Galveston / Brazoria County |
PH Robinson, Meadow |
| Upgrade to increase thermal limits as part of FRM upgrades Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades ERCOT project 87479B |
CNP Tier 4 |
Conceptual Current-year planned tab |
345 | Jul 2025 | PH Robinson to Meadow Galveston / Brazoria County |
PH Robinson, Meadow |
| Meadow 345kV Substation Expansion for Aldrin 345 BESS(25INR0425). Expand 345kV Meadow (MDO) substation for ALDRIN (ALD) / Aldrin 345 BESS (25INR0425). ERCOT project 90189 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2027 | Meadow Brazoria County |
Meadow |
| Facility Ratings Methodology (FRM) Upgrades Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades ERCOT project 90232B |
CNP Tier 4 |
Planned Future tab |
345 | Feb 2027 | PH Robinson to Meadow Galveston / Brazoria County |
PH Robinson, Meadow |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 87479B | Status as reported | Planned → Conceptual |
| July 13, 2026 | 90232B | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 90232B | Projected in-service date | Dec 2026 → Feb 2027 |
| July 13, 2026 | 90232B | Projected in-service date | Mar 2026 → Dec 2026 |
| June 1, 2026 | 103006B | First listed | on the Future tab |
| June 1, 2026 | 103344A | First listed | on the Future tab |
| June 1, 2026 | 103344B | First listed | on the Future tab |
| June 1, 2026 | 90232B | Projected in-service date | Feb 2026 → Mar 2026 |
| February 1, 2026 | 90232B | Projected in-service date | Nov 2025 → Feb 2026 |
| October 1, 2025 | 90189 | Projected in-service date | Nov 2027 → Dec 2027 |
| October 1, 2025 | 90232B | Projected in-service date | Jul 2025 → Nov 2025 |
| June 1, 2025 | 87479B | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 90232B | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 90189 | First listed | on the Future tab |
| February 1, 2025 | 90232B | First listed | on the Future tab |
| October 1, 2024 | 87479B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.