Substation Scout

Meadow

Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2015.

Brazoriacounty as printed
345kV
CNPutility
6projects listed

Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand 345kV Meadow (MDO) substation” — project 90189, as the utility reported it

A HIFLD substation record has the same name and county: MEADOW (BRAZORIA County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
CEHE Upgrades as part of TNMP's Galveston Region Project
Upgrade Meadow Auto A1 to increase thermal limits.
ERCOT project 103006B · RPG 24RPG039
CNP
Tier 3
Planned
Future tab
345 Dec 2028 Meadow
Brazoria County
Meadow
PH Robinson to WA Parish Hardening 25RPG028
Rebuild and reconductor Ckt.99A PH Robinson to Meadow as a Hardening upgrade
ERCOT project 103344A · RPG 25RPG028
CNP
Tier 4
Planned
Future tab
345 Dec 2028 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow
PH Robinson to WA Parish Hardening 25RPG028
Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits.
ERCOT project 103344B · RPG 25RPG028
CNP
Tier 4
Planned
Future tab
345 Dec 2028 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow
Upgrade to increase thermal limits as part of FRM upgrades
Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades
ERCOT project 87479B
CNP
Tier 4
Conceptual
Current-year planned tab
345 Jul 2025 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow
Meadow 345kV Substation Expansion for Aldrin 345 BESS(25INR0425).
Expand 345kV Meadow (MDO) substation for ALDRIN (ALD) / Aldrin 345 BESS (25INR0425).
ERCOT project 90189
CNP
Tier 4
Planned
Future tab
345 Dec 2027 Meadow
Brazoria County
Meadow
Facility Ratings Methodology (FRM) Upgrades
Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades
ERCOT project 90232B
CNP
Tier 4
Planned
Future tab
345 Feb 2027 PH Robinson to Meadow
Galveston / Brazoria County
PH Robinson, Meadow

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202687479BStatus as reportedPlanned → Conceptual
July 13, 202690232BMoved between tabsCurrent-year planned → Future
July 13, 202690232BProjected in-service dateDec 2026 → Feb 2027
July 13, 202690232BProjected in-service dateMar 2026 → Dec 2026
June 1, 2026103006BFirst listedon the Future tab
June 1, 2026103344AFirst listedon the Future tab
June 1, 2026103344BFirst listedon the Future tab
June 1, 202690232BProjected in-service dateFeb 2026 → Mar 2026
February 1, 202690232BProjected in-service dateNov 2025 → Feb 2026
October 1, 202590189Projected in-service dateNov 2027 → Dec 2027
October 1, 202590232BProjected in-service dateJul 2025 → Nov 2025
June 1, 202587479BMoved between tabsFuture → Current-year planned
June 1, 202590232BMoved between tabsFuture → Current-year planned
February 1, 202590189First listedon the Future tab
February 1, 202590232BFirst listedon the Future tab
October 1, 202487479BFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.