Substation Scout

Galveston, TX interconnection queue

11 active projects totalling 2,943.3 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

11active projects
2,943.3active MW
13total filed
Queue IDProjectkVMWResourceStatus
30INR0003 Hecate Energy Jamaica Wind 345 1,029.4 Wind SS Completed, FIS Started, No IA
24INR0281 Red Egret BESS 138 310.6 Battery SS Completed, FIS Completed, IA
25INR0262 Shepard Energy Storage 138 256.8 Battery SS Completed, FIS Completed, IA
23INR0290 Zeya BESS 138 255.3 Battery SS Completed, FIS Started, IA
26INR0333 VERTUS ENERGY STORAGE n/r 207.3 Battery SS Completed, FIS Completed, IA
23INR0485 Hacienda Storage 138 205.8 Battery SS Completed, FIS Started, No IA
28INR0490 Vertus Energy Storage 2 138 204.9 Battery SS Completed, FIS Started, No IA
26INR0340 SOUTHERN SELECT ENERGY STORAGE n/r 204.9 Battery SS Completed, FIS Completed, IA
27INR0416 Kresge Land Battery Storage 138 200 Battery Cancelled
28INR0465 Valcrest BESS 138 154.3 Battery SS Completed, FIS Started, No IA
25INR0310 IEP Blackhawk 138 100 Battery SS Completed, FIS Started, No IA
25INR0243 CLUTCH CITY STORAGE I SLF n/r 16.6 Battery Inactive
21INR0012 Air Products GCA 69 14 Gas SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.