Lytton Springs
Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Caldwell County. First named in the release with data as of October 1, 2022.
A HIFLD substation record has the same name and county: LYTTON SPRINGS (CALDWELL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Caldwell, TX: ERCOT queue, 16 active of 17. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| LyttonSprings_Mendoza_Transmission_Line_Upgrade LCRA TSC will upgrade T534 Lytton Springs - Mendoza 138-kV transmission line to obtain a higher operational rating. ERCOT project 100184 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2027 | Lytton Springs to Mendoza Caldwell County |
Lytton Springs, Mendoza |
| FPP Yard 2 - Lytton Springs Transmission Line Upgrade Upgrade the FPP Yard 2 - Lytton Springs 345-kV circuit to achieve a 1351 MVA minimum emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load. ERCOT project 110128 |
LCRATSC Tier 4 |
Conceptual Future tab |
345 | Dec 2030 | Fayetteville Power Plant Yard 2 to Lytton Springs Fayette / Caldwell County |
Fayetteville Power Plant Yard 2, Lytton Springs |
| Lytton Springs - Mendoza Transmission Line Upgrade Upgrade the 0.6-mile Lytton Springs - Mendoza 138-kV circuit to achieve a minimum 724 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load. ERCOT project 110174 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | May 2027 | Lytton Springs to Mendoza Caldwell County |
Lytton Springs, Mendoza |
| Upgrade CKT943 to 3000 amperes Replace existing 2-795ACSR conductors with 2-795 ACSS conductors and the upgrade the terminal equipment to 3000 amperes. ERCOT project 71408 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2030 | Lytton Springs to Pilot Knob Caldwell / Travis County |
Lytton Springs, Pilot Knob |
| FPP Yard 2 - Lytton Springs Transmission Line Overhaul LCRA TSC will overhaul FPP Yard #2 - Lytton Springs 345-kV transmission line T255 to ensure structural integrity of the circuit. Engineering will review this transmission circuit for scope including hardware/insulator integrity, structural load issues, need for containment (dead-ends) structures, and clearances at highway and railroad crossings. ERCOT project 85963 · RPG 24RPG013 |
LCRATSC Tier 4 |
Planned Completed tab |
345 | May 2026 actual 2026-05 |
FPP Yard 2 to Lytton Springs Fayette / Caldwell County |
FPP Yard 2, Lytton Springs |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110128 | First listed | on the Future tab |
| July 13, 2026 | 110174 | First listed | on the Future tab |
| July 13, 2026 | 71408 | Projected in-service date | Jun 2028 → Jun 2030 |
| June 1, 2026 | 85963 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 85963 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 100184 | First listed | on the Future tab |
| June 1, 2025 | 71408 | Projected in-service date | Jun 2026 → Jun 2028 |
| October 1, 2024 | 85963 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.