Lytton Springs

Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Caldwell County. First named in the release with data as of October 1, 2022.

Caldwellcounty as printed
138, 345kV
AEN, LCRATSCutility
5projects listed

A HIFLD substation record has the same name and county: LYTTON SPRINGS (CALDWELL County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Caldwell, TX: ERCOT queue, 16 active of 17. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
LyttonSprings_Mendoza_Transmission_Line_Upgrade
LCRA TSC will upgrade T534 Lytton Springs - Mendoza 138-kV transmission line to obtain a higher operational rating.
ERCOT project 100184
LCRATSC
Tier 4
Planned
Future tab
138 May 2027 Lytton Springs to Mendoza
Caldwell County
Lytton Springs, Mendoza
FPP Yard 2 - Lytton Springs Transmission Line Upgrade
Upgrade the FPP Yard 2 - Lytton Springs 345-kV circuit to achieve a 1351 MVA minimum emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load.
ERCOT project 110128
LCRATSC
Tier 4
Conceptual
Future tab
345 Dec 2030 Fayetteville Power Plant Yard 2 to Lytton Springs
Fayette / Caldwell County
Fayetteville Power Plant Yard 2, Lytton Springs
Lytton Springs - Mendoza Transmission Line Upgrade
Upgrade the 0.6-mile Lytton Springs - Mendoza 138-kV circuit to achieve a minimum 724 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load.
ERCOT project 110174
LCRATSC
Tier 4
Conceptual
Future tab
138 May 2027 Lytton Springs to Mendoza
Caldwell County
Lytton Springs, Mendoza
Upgrade CKT943 to 3000 amperes
Replace existing 2-795ACSR conductors with 2-795 ACSS conductors and the upgrade the terminal equipment to 3000 amperes.
ERCOT project 71408
AEN
Tier 4
Planned
Future tab
138 Jun 2030 Lytton Springs to Pilot Knob
Caldwell / Travis County
Lytton Springs, Pilot Knob
FPP Yard 2 - Lytton Springs Transmission Line Overhaul
LCRA TSC will overhaul FPP Yard #2 - Lytton Springs 345-kV transmission line T255 to ensure structural integrity of the circuit. Engineering will review this transmission circuit for scope including hardware/insulator integrity, structural load issues, need for containment (dead-ends) structures, and clearances at highway and railroad crossings.
ERCOT project 85963 · RPG 24RPG013
LCRATSC
Tier 4
Planned
Completed tab
345 May 2026
actual 2026-05
FPP Yard 2 to Lytton Springs
Fayette / Caldwell County
FPP Yard 2, Lytton Springs

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110128First listedon the Future tab
July 13, 2026110174First listedon the Future tab
July 13, 202671408Projected in-service dateJun 2028 → Jun 2030
June 1, 202685963Moved between tabsCurrent-year planned → Completed
February 1, 202685963Moved between tabsFuture → Current-year planned
October 1, 2025100184First listedon the Future tab
June 1, 202571408Projected in-service dateJun 2026 → Jun 2028
October 1, 202485963First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.