Fayetteville Power Plant Yard 2

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Fayette County. First named in the release with data as of July 13, 2026.

Fayettecounty as printed
345kV
LCRATSCutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Fayette, TX: ERCOT queue, 4 active of 5. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
FPP Yard 2 - Lytton Springs Transmission Line Upgrade
Upgrade the FPP Yard 2 - Lytton Springs 345-kV circuit to achieve a 1351 MVA minimum emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load.
ERCOT project 110128
LCRATSC
Tier 4
Conceptual
Future tab
345 Dec 2030 Fayetteville Power Plant Yard 2 to Lytton Springs
Fayette / Caldwell County
Fayetteville Power Plant Yard 2, Lytton Springs

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110128First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.