Waterfowl

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of October 1, 2021.

Brazoriacounty as printed
138kV
CNPutility
4projects listed

Described as new. The quoted wording calls this substation new. “New 138kV Waterfowl substation” — project 64581B title, as the utility reported it

Reported complete. Project 64581B is on the Completed tab (actual in-service 2026-05); Project 64581C is on the Completed tab (actual in-service 2026-05); Project 64581D is on the Completed tab (actual in-service 2026-05); Project 90336 is on the Completed tab (actual in-service 2026-05), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.

Location

Brazoria County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Note: Already in service: all three TPIT rows are on the Completed tab, In-Service, ISD 2026-05. The station replaces the 'Seaway Switchrack' (OSM 'Seaway Substation', way 520652074, 28.94882,-95.43273, untagged operator); it may sit at or near that site, but no source says so, so that point is not used.

Sources: ERCOT TPIT, projects 64581B, 64581C, 64581D, 90336 (release 39, 2026-10-01) · OpenStreetMap: Jones Creek, Franklins Camp, Seadoc and Seaway substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
New 138kV Waterfowl substation
Install new CEHE-owned 138kV Waterfowl (WTR) substation. Reconfigure existing Ckt.02F and install new conductor to create new Ckt.54A Jones Creek to Waterfowl
ERCOT project 64581B · RPG 21RPG009
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2026-05
Jones Creek to Waterfowl
Brazoria County
Jones Creek, Waterfowl
New 138kV Waterfowl substation
Install new CEHE-owned 138kV Waterfowl (WTR) substation. Convert customer-owned Seadoc substation to loop service. Reconfigure existing Ckt.02F and reconnect Seadoc/Seaway to create new Ckt.02F Jones creek to Seadoc loop to Seaway tap to Waterfowl.
ERCOT project 64581C · RPG 21RPG009
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2026-05
Jones Creek to Waterfowl
Brazoria County
Jones Creek, Waterfowl
New 138kV Waterfowl substation
Install new CEHE-owned 138kV Waterfowl (WTR) substation. Remove existing Seaway Switchrack. Reconfigure existing Ckt.02F to create new Ckt.02L Waterfowl to Franklins Camp.
ERCOT project 64581D · RPG 21RPG009
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2026-05
Waterfowl to Franklins Camp
Brazoria County
Waterfowl, Franklins Camp
DURZNO (DUR) 138kV Customer Substation
Install new customer-owned 138kV DURZNO (DUR) substation. Loop into Ckt.54 to create new Ckt.54 Jones Creek to DURZNO to Waterfowl.
ERCOT project 90336
CNP
Tier 4
In-Service
Completed tab
138 May 2026
actual 2026-05
DURAZNO to Jones Creek/ Waterfowl
Brazoria County
DURAZNO, Jones Creek, Waterfowl

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 202664581BMoved between tabsCurrent-year planned → Completed
June 1, 202664581BStatus as reportedPlanned → In-Service
June 1, 202664581CMoved between tabsCurrent-year planned → Completed
June 1, 202664581CStatus as reportedPlanned → In-Service
June 1, 202664581DMoved between tabsCurrent-year planned → Completed
June 1, 202664581DStatus as reportedPlanned → In-Service
June 1, 202664581DProjected in-service dateApr 2026 → May 2026
June 1, 202690336Moved between tabsCurrent-year planned → Completed
June 1, 202690336Status as reportedPlanned → In-Service
February 1, 202664581BMoved between tabsFuture → Current-year planned
February 1, 202664581BProjected in-service dateApr 2026 → May 2026
February 1, 202664581CMoved between tabsFuture → Current-year planned
February 1, 202664581CProjected in-service dateApr 2026 → May 2026
February 1, 202664581DMoved between tabsFuture → Current-year planned
February 1, 202690336Moved between tabsFuture → Current-year planned
February 1, 202690336Projected in-service dateApr 2026 → May 2026
October 1, 202564581BProjected in-service dateJan 2026 → Apr 2026
October 1, 202564581CProjected in-service dateJan 2026 → Apr 2026
October 1, 202564581DProjected in-service dateJan 2026 → Apr 2026
October 1, 202590336Projected in-service dateMar 2026 → Apr 2026
February 1, 202564581BProjected in-service dateOct 2025 → Jan 2026
February 1, 202564581CProjected in-service dateOct 2025 → Jan 2026
February 1, 202564581DProjected in-service dateOct 2025 → Jan 2026
February 1, 202590336First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.