Waterfowl
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of October 1, 2021.
Described as new. The quoted wording calls this substation new. “New 138kV Waterfowl substation” — project 64581B title, as the utility reported it
Reported complete. Project 64581B is on the Completed tab (actual in-service 2026-05); Project 64581C is on the Completed tab (actual in-service 2026-05); Project 64581D is on the Completed tab (actual in-service 2026-05); Project 90336 is on the Completed tab (actual in-service 2026-05), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Location
Brazoria County, TX
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: Already in service: all three TPIT rows are on the Completed tab, In-Service, ISD 2026-05. The station replaces the 'Seaway Switchrack' (OSM 'Seaway Substation', way 520652074, 28.94882,-95.43273, untagged operator); it may sit at or near that site, but no source says so, so that point is not used.
Sources: ERCOT TPIT, projects 64581B, 64581C, 64581D, 90336 (release 39, 2026-10-01) · OpenStreetMap: Jones Creek, Franklins Camp, Seadoc and Seaway substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| New 138kV Waterfowl substation Install new CEHE-owned 138kV Waterfowl (WTR) substation. Reconfigure existing Ckt.02F and install new conductor to create new Ckt.54A Jones Creek to Waterfowl ERCOT project 64581B · RPG 21RPG009 |
CNP Tier 3 |
In-Service Completed tab |
138 | May 2026 actual 2026-05 |
Jones Creek to Waterfowl Brazoria County |
Jones Creek, Waterfowl |
| New 138kV Waterfowl substation Install new CEHE-owned 138kV Waterfowl (WTR) substation. Convert customer-owned Seadoc substation to loop service. Reconfigure existing Ckt.02F and reconnect Seadoc/Seaway to create new Ckt.02F Jones creek to Seadoc loop to Seaway tap to Waterfowl. ERCOT project 64581C · RPG 21RPG009 |
CNP Tier 3 |
In-Service Completed tab |
138 | May 2026 actual 2026-05 |
Jones Creek to Waterfowl Brazoria County |
Jones Creek, Waterfowl |
| New 138kV Waterfowl substation Install new CEHE-owned 138kV Waterfowl (WTR) substation. Remove existing Seaway Switchrack. Reconfigure existing Ckt.02F to create new Ckt.02L Waterfowl to Franklins Camp. ERCOT project 64581D · RPG 21RPG009 |
CNP Tier 3 |
In-Service Completed tab |
138 | May 2026 actual 2026-05 |
Waterfowl to Franklins Camp Brazoria County |
Waterfowl, Franklins Camp |
| DURZNO (DUR) 138kV Customer Substation Install new customer-owned 138kV DURZNO (DUR) substation. Loop into Ckt.54 to create new Ckt.54 Jones Creek to DURZNO to Waterfowl. ERCOT project 90336 |
CNP Tier 4 |
In-Service Completed tab |
138 | May 2026 actual 2026-05 |
DURAZNO to Jones Creek/ Waterfowl Brazoria County |
DURAZNO, Jones Creek, Waterfowl |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 64581B | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 64581B | Status as reported | Planned → In-Service |
| June 1, 2026 | 64581C | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 64581C | Status as reported | Planned → In-Service |
| June 1, 2026 | 64581D | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 64581D | Status as reported | Planned → In-Service |
| June 1, 2026 | 64581D | Projected in-service date | Apr 2026 → May 2026 |
| June 1, 2026 | 90336 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 90336 | Status as reported | Planned → In-Service |
| February 1, 2026 | 64581B | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 64581B | Projected in-service date | Apr 2026 → May 2026 |
| February 1, 2026 | 64581C | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 64581C | Projected in-service date | Apr 2026 → May 2026 |
| February 1, 2026 | 64581D | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 90336 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 90336 | Projected in-service date | Apr 2026 → May 2026 |
| October 1, 2025 | 64581B | Projected in-service date | Jan 2026 → Apr 2026 |
| October 1, 2025 | 64581C | Projected in-service date | Jan 2026 → Apr 2026 |
| October 1, 2025 | 64581D | Projected in-service date | Jan 2026 → Apr 2026 |
| October 1, 2025 | 90336 | Projected in-service date | Mar 2026 → Apr 2026 |
| February 1, 2025 | 64581B | Projected in-service date | Oct 2025 → Jan 2026 |
| February 1, 2025 | 64581C | Projected in-service date | Oct 2025 → Jan 2026 |
| February 1, 2025 | 64581D | Projected in-service date | Oct 2025 → Jan 2026 |
| February 1, 2025 | 90336 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.