CAMDEN
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2015.
Brazoriacounty as printed
138kV
CNPutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits. Upgrade Ckt.26E SINTEK to CAMDEN to increase thermal limits. ERCOT project 109575I · RPG 26RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2029 | SINTEK to CAMDEN Brazoria County |
SINTEK, CAMDEN |
| Upgrade Ckt.26 STRATT to SINTEK to increase thermal limits. Upgrade Ckt.26F Velasco to CAMDEN to increase thermal limits. Upgrade Ckt.26F CAMDEN to Velasco to increase thermal limits. ERCOT project 85987B · RPG 24RPG012 |
CNP Tier 3 |
Planned Future tab |
138 | May 2027 | CAMDEN to Velasco Brazoria County |
CAMDEN, Velasco |
| Clute to Velasco Ckt.82 Upgrades RPG Upgrade Ckt.26E SINTEK to CAMDEN to increase thermal limits. ERCOT project 90242A · RPG 24RPG012 |
CNP Tier 4 |
Planned Future tab |
138 | May 2027 | SINTEK to CAMDEN Brazoria County |
SINTEK, CAMDEN |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109575I | First listed | on the Future tab |
| February 1, 2026 | 85987B | Projected in-service date | May 2026 → May 2027 |
| February 1, 2026 | 90242A | Projected in-service date | May 2026 → May 2027 |
| February 1, 2025 | 90242A | First listed | on the Future tab |
| October 1, 2024 | 85987B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.