Substation Scout

Smithville

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of June 1, 2015.

Bastropcounty as printed
138kV
LCRATSCutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Alum Creek - Smithville Transmission Line Upgrade
LCRA will upgrade the Transmission Line between Alum Creek (7314) and Smithville (7318) to a minimum rating of 340 MVA. Upgrade project for Batch Zero Base Load
ERCOT project 110142
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Smithville to Alum Creek
Bastrop County
Smithville, Alum Creek
Smithville_Substation_Upgrade
Increase the reliability of the Smithville substation by replacing assets identified as a high failure risk, removing the 138x69-kV auto transformer, and converting T344 New Rosanky - Smithville to 138-kV
ERCOT project 91386 · utility no. PLC-7727
LCRATSC
Tier 4
Planned
Future tab
138 Jun 2028 No terminals printed
Bastrop County
Smithville

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110142First listedon the Future tab
February 1, 202691386Projected in-service dateDec 2027 → Jun 2028
June 1, 202591386First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first