Substation Scout

New Piqua #6 69 kV Substation

Named in 1 PJM planning document for 1 project, on October 8, 2024.

Newdescribed as
AMPTzone
69 kVkV as printed
1mentions

Described as new: “Replace the existing line tap to the Piqua #5 substation with a new 69kV 3 breaker ring” — source, page 8

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Piqua, OH
AMPT-2023-001 · s3216.1 (AMPT); s3216.2 (AES)
Not printed $14.8 M 12/1/2027 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named HARDIN; NEW PIQUA 6; PIQUA SUB 5 → HARDIN; PIQUA 6; PIQUA SUB 5 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2024-10-08 TEAC
Informational Only - AMPT Local Plan submission of supplemental project 2024 p. 8
Piqua, OH “Replace the existing line tap to the Piqua #5 substation with a new 69kV 3 breaker ring”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this