Substation Scout

Tulsa, OK interconnection queue

8 active projects totaling 1,234.5 MW in the SPP queue, plus 6 with terminal status (shown grayed).

8active projects
1,234.5active MW
14total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-130 Not reported 345 1,900 Wind Withdrawn
GEN-2024-131 Not reported 345 1,100 Wind Withdrawn
GEN-2022-167 Not reported 345 250 Solar Withdrawn
GEN-2024-171 Not reported 345 250 Battery Active
GEN-2024-270 Not reported 345 250 Solar Withdrawn
GEN-2018-028 Not reported 138 200 Battery Active
GEN-2025-SR25 Not reported 138 200 Other Active
GEN-2024-318 Not reported 138 199 Battery Active
GEN-2005-024 Not reported n/r 181 Gas Operational
GEN-2005-023 Not reported n/r 172 Gas Withdrawn
GEN-2018-027 Not reported 138 100 Battery Active
GEN-2025-SR21 Not reported 138 100 Other Active
GEN-2008-070S Not reported n/r 16.8 Other Withdrawn
GEN-2010-055 Not reported 138 4.5 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first