Substation Scout

SPP request GEN-2010-055

SPP queue ID GEN-2010-055

Queue request GEN-2010-055 was listed in the SPP interconnection queue at the end of 2025 as a 4.5 MW gas project in Tulsa County, OK, according to Berkeley Lab’s queue data file. The filing names Wekiwa as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of February 27, 2013.

Queue IDGEN-2010-055
Project nameNot reported
Status (as published)Operational
SubstationWekiwa
Point of interconnectionWekiwa 138kV
CountyTulsa
StateOK
Voltage138 kV
Capacity4.5 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2013-02-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tulsa, OK: 14 requests in the SPP queue, 8 active totaling 1,234.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2011-001-8; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2010-09-30
Operational date2013-02-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first