Substation Scout

SPP request GEN-2024-171

SPP queue ID GEN-2024-171

Queue request GEN-2024-171 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW battery project in Tulsa County, OK, according to Berkeley Lab’s queue data file. The filing names Tulsa North - Grand River Energy Center Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 17, 2028.

Queue IDGEN-2024-171
Project nameNot reported
Status (as published)Active
SubstationTulsa North - Grand River Energy Center Line
Point of interconnectionTulsa North - Grand River Energy Center 345 kV Line
CountyTulsa
StateOK
Voltage345 kV
Capacity250 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-05-17
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tulsa, OK: 14 requests in the SPP queue, 8 active totaling 1,234.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGRDA
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.