SPP request GEN-2025-SR25

SPP queue ID GEN-2025-SR25

Queue request GEN-2025-SR25 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW project in Tulsa County, OK, according to Berkeley Lab’s queue data file. The filing names Tulsa North Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2028.

Queue IDGEN-2025-SR25
Project nameNot reported
Status (as published)Active
SubstationTulsa North Substation
Point of interconnectionTulsa North 138kV Substation
CountyTulsa
StateOK
Voltage138 kV
Capacity200 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2028-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tulsa North Substation substation: 2 requests in the SPP queue, 2 active totaling 400 MW.

Queue IDProjectMWResourceStatus
GEN-2018-028Not reported200BatteryActive

Tulsa, OK: 14 requests in the SPP queue, 8 active totaling 1,234.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2025-06-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.