Mayes, OK interconnection queue

16 active projects totaling 2,446.4 MW in the SPP queue, plus 7 with terminal status (shown grayed).

16active projects
2,446.4active MW
23total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-154 Not reported n/r 540 Gas Withdrawn
GEN-2013-028 Not reported 345 538 Gas Operational
GEN-2024-294 Not reported 345 500 Hybrid Active
GEN-2021-047 Not reported 345 250 Solar Active
GEN-2023-028 Not reported 161 230 Hybrid Withdrawn
GEN-2022-072 Not reported 161 181 Solar Withdrawn
GEN-2023-027 Not reported 138 150 Hybrid Withdrawn
GEN-2023-049 Not reported 161 150 Hybrid Withdrawn
GEN-2017-077 Not reported n/r 124.7 Solar Active
GEN-2023-SR22 Not reported n/r 124.7 Battery Active
GEN-2017-061 Not reported 161 101.5 Solar Active
GEN-2023-SR27 Not reported 161 101.5 Battery Active
GEN-2019-002 Not reported 161 100 Battery Active
GEN-2020-092 Not reported 138 100 Solar Active
GEN-2023-055 Not reported 161 100 Battery Active
GEN-2024-180 Not reported 161 100 Battery Active
GEN-2017-073 Not reported 161 72.5 Solar Active
GEN-2017-074 Not reported 138 72.5 Solar Active
GEN-2023-SR25 Not reported 161 72.5 Battery Active
GEN-2023-SR26 Not reported 138 72.5 Battery Active
GEN-2023-029 Not reported 69 50 Solar Withdrawn
GEN-2018-034 Not reported 161 40 Gas Withdrawn
GEN-2008-005 Not reported n/r 16 Hydro Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.