Substation Scout

SPP request GEN-2013-028

SPP queue ID GEN-2013-028

Queue request GEN-2013-028 was listed in the SPP interconnection queue at the end of 2025 as a 538 MW gas project in Mayes County, OK, according to Berkeley Lab’s queue data file. The filing names Tap N Tulsa - GRDA 1 as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 23, 2017.

Queue IDGEN-2013-028
Project nameNot reported
Status (as published)Operational
SubstationTap N Tulsa - GRDA 1
Point of interconnectionTap N Tulsa - GRDA 1 345kV
CountyMayes
StateOK
Voltage345 kV
Capacity538 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2017-12-23
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mayes, OK: 23 requests in the SPP queue, 16 active totaling 2,446.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGRDA
ClusterDISIS-2013-002-2; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2013-09-30
Operational date2017-12-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first