SPP request GEN-2023-SR25

SPP queue ID GEN-2023-SR25

Queue request GEN-2023-SR25 was listed in the SPP interconnection queue at the end of 2025 as a 72.5 MW battery project in Mayes County, OK, according to Berkeley Lab’s queue data file. The filing names Dry Gulch sub as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2024.

Queue IDGEN-2023-SR25
Project nameNot reported
Status (as published)Active
SubstationDry Gulch sub
Point of interconnectionDry Gulch 161kV sub
CountyMayes
StateOK
Voltage161 kV
Capacity72.5 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2024-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dry Gulch sub substation: 2 requests in the SPP queue, 2 active totaling 145 MW.

Queue IDProjectMWResourceStatus
GEN-2017-073Not reported72.5SolarActive

Mayes, OK: 23 requests in the SPP queue, 16 active totaling 2,446.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGRDA
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2023-07-12
Operational date2024-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.