Substation Scout

SPP request GEN-2021-047

SPP queue ID GEN-2021-047

Queue request GEN-2021-047 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW solar project in Mayes County, OK, according to Berkeley Lab’s queue data file. The filing names Tulsa (Bus #) - Igloo (Bus #) line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2029.

Queue IDGEN-2021-047
Project nameNot reported
Status (as published)Active
SubstationTulsa (Bus #) - Igloo (Bus #) line
Point of interconnectionTulsa (Bus #509852) - Igloo (Bus #513596) 345kV line
CountyMayes
StateOK
Voltage345 kV
Capacity250 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mayes, OK: 23 requests in the SPP queue, 16 active totaling 2,446.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGRDA
ClusterDISIS-2021-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2021-04-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first