Hale, TX interconnection queue
8 active projects totaling 1,977.1 MW in the SPP queue, plus 14 with terminal status (shown grayed).
8active projects
1,977.1active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| ERAS-2025-021 | Not reported | 345 | 500 | Wind | Active |
| GEN-2023-237 | Not reported | 345 | 500 | Wind | Withdrawn |
| GEN-2012-020 | Not reported | 230 | 478 | Wind | Operational |
| GEN-2008-125 | Not reported | n/r | 330 | Gas | Withdrawn |
| GEN-2008-128 | Not reported | n/r | 330 | Gas | Withdrawn |
| GEN-2015-068 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2015-037 | Not reported | 345 | 253 | Solar | Withdrawn |
| GEN-2010-033 | Not reported | 345 | 230 | Wind | Withdrawn |
| ERAS-2025-002 | Not reported | 345 | 217 | Gas | Active |
| GEN-2023-183 | Not reported | 345 | 217 | Gas | Withdrawn |
| GEN-2010-032 | Not reported | 345 | 216 | Wind | Withdrawn |
| GEN-2012-037 | Not reported | 345 | 203 | Gas | Operational |
| GEN-2013-016 | Not reported | 345 | 203 | Gas | Operational |
| GEN-2022-147 | Not reported | 345 | 203 | Gas | Active |
| GEN-2014-073 | Not reported | 115 | 200 | Wind | Withdrawn |
| GEN-2022-082 | Not reported | 230 | 180 | Solar | Withdrawn |
| GEN-2006-018 | Not reported | 230 | 168.1 | Gas | Operational |
| GEN-2014-029 | Not reported | 230 | 108.8 | Solar | Withdrawn |
| GEN-2017-059 | Not reported | 230 | 90 | Solar | Withdrawn |
| GEN-2023-008 | Not reported | 230 | 75 | Solar | Withdrawn |
| GEN-2010-046 | Not reported | 230 | 56 | Gas | Withdrawn |
| GEN-2015-041 | Not reported | 345 | 5 | Gas | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.