Substation Scout

Hale, TX interconnection queue

8 active projects totaling 1,977.1 MW in the SPP queue, plus 14 with terminal status (shown grayed).

8active projects
1,977.1active MW
22total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-021 Not reported 345 500 Wind Active
GEN-2023-237 Not reported 345 500 Wind Withdrawn
GEN-2012-020 Not reported 230 478 Wind Operational
GEN-2008-125 Not reported n/r 330 Gas Withdrawn
GEN-2008-128 Not reported n/r 330 Gas Withdrawn
GEN-2015-068 Not reported 345 300 Wind Withdrawn
GEN-2015-037 Not reported 345 253 Solar Withdrawn
GEN-2010-033 Not reported 345 230 Wind Withdrawn
ERAS-2025-002 Not reported 345 217 Gas Active
GEN-2023-183 Not reported 345 217 Gas Withdrawn
GEN-2010-032 Not reported 345 216 Wind Withdrawn
GEN-2012-037 Not reported 345 203 Gas Operational
GEN-2013-016 Not reported 345 203 Gas Operational
GEN-2022-147 Not reported 345 203 Gas Active
GEN-2014-073 Not reported 115 200 Wind Withdrawn
GEN-2022-082 Not reported 230 180 Solar Withdrawn
GEN-2006-018 Not reported 230 168.1 Gas Operational
GEN-2014-029 Not reported 230 108.8 Solar Withdrawn
GEN-2017-059 Not reported 230 90 Solar Withdrawn
GEN-2023-008 Not reported 230 75 Solar Withdrawn
GEN-2010-046 Not reported 230 56 Gas Withdrawn
GEN-2015-041 Not reported 345 5 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.