SPP request GEN-2022-147

SPP queue ID GEN-2022-147

Queue request GEN-2022-147 was listed in the SPP interconnection queue at the end of 2025 as a 203 MW gas project in Hale County, TX, according to Berkeley Lab’s queue data file. The filing names Tuco as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 11, 2025.

Queue IDGEN-2022-147
Project nameNot reported
Status (as published)Active
SubstationTuco
Point of interconnectionTuco 345kV
CountyHale
StateTX
Voltage345 kV
Capacity203 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-04-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tuco substation: 2 requests in the SPP queue, 1 active totaling 203 MW.

Queue IDProjectMWResourceStatus
GEN-2023-183Not reported217GasWithdrawn

Hale, TX: 22 requests in the SPP queue, 8 active totaling 1,977.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2022-001; 05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-02-21
Operational date2025-04-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.