SPP request ERAS-2025-021

SPP queue ID ERAS-2025-021

Queue request ERAS-2025-021 was listed in the SPP interconnection queue at the end of 2025 as a 500 MW wind project in Hale County, TX, according to Berkeley Lab’s queue data file. The filing names Border-Tuco Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2030.

Queue IDERAS-2025-021
Project nameNot reported
Status (as published)Active
SubstationBorder-Tuco Line
Point of interconnectionBorder-Tuco 345kV Line
CountyHale
StateTX
Voltage345 kV
Capacity500 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2030-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hale, TX: 22 requests in the SPP queue, 8 active totaling 1,977.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterERAS-2025-001; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-10-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.