Cass, NE interconnection queue

11 active projects totaling 2,803.7 MW in the SPP queue, plus 12 with terminal status (shown grayed).

11active projects
2,803.7active MW
23total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-035 Not reported 345 424.5 Gas Withdrawn
GEN-2024-213 Not reported 345 360 Gas Active
GEN-2020-036 Not reported 345 303 Hybrid Withdrawn
GEN-2020-040 Not reported 345 303 Gas Withdrawn
GEN-2024-211 Not reported 345 303 Gas Active
GEN-2024-212 Not reported 345 303 Gas Active
GEN-2020-038 Not reported 345 272.7 Gas Active
GEN-2023-079 Not reported 345 272.7 Gas Active
GEN-2023-077 Not reported 345 255 Gas Active
GEN-2023-078 Not reported 345 255 Gas Active
GEN-2008-121O Not reported n/r 249 Gas Withdrawn
GEN-2018-033 Not reported 345 200 Battery Suspended
GEN-2021-040 Not reported 345 200 Battery Active
GEN-2025-SR26 Not reported 345 200 Other Active
GEN-2021-108 Not reported 345 182.3 Solar Active
GEN-2007-033O Not reported n/r 170 Gas Withdrawn
GEN-2023-197 Not reported 161 150 Solar Withdrawn
GEN-2009-003O1 Not reported 161 80 Wind Withdrawn
GEN-2020-037 Not reported 345 56.5 Gas Withdrawn
GEN-2020-039 Not reported 345 56.5 Gas Withdrawn
GEN-2020-041 Not reported 345 56.5 Gas Withdrawn
GEN-2020-042 Not reported 345 56.5 Gas Withdrawn
GEN-2019-010 Not reported 69 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.