SPP request GEN-2018-033

SPP queue ID GEN-2018-033

Queue request GEN-2018-033 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Cass County, NE, according to Berkeley Lab’s queue data file. The filing names Cass County Substation as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of November 30, 2029.

Queue IDGEN-2018-033
Project nameNot reported
Status (as published)Suspended
SubstationCass County Substation
Point of interconnectionCass County 345kV Substation
CountyCass
StateNE
Voltage345 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cass County Substation substation: 2 requests in the SPP queue, 2 active totaling 400 MW.

Queue IDProjectMWResourceStatus
GEN-2025-SR26Not reported200OtherActive

Cass, NE: 23 requests in the SPP queue, 11 active totaling 2,803.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
ClusterDISIS-2018-001; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Suspended
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SUSPENSION
Queue date2018-05-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.