SPP request GEN-2024-211

SPP queue ID GEN-2024-211

Queue request GEN-2024-211 was listed in the SPP interconnection queue at the end of 2025 as a 303 MW gas project in Cass County, NE, according to Berkeley Lab’s queue data file. The filing names Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 1, 2035.

Queue IDGEN-2024-211
Project nameNot reported
Status (as published)Active
SubstationSubstation
Point of interconnectionSubstation 3740 345 kV
CountyCass
StateNE
Voltage345 kV
Capacity303 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2035-02-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Substation substation: 19 requests in the SPP queue, 9 active totaling 2,352.4 MW.

Queue IDProjectMWResourceStatus
GEN-2024-213Not reported360GasActive
GEN-2024-212Not reported303GasActive
GEN-2020-038Not reported272.7GasActive
GEN-2023-079Not reported272.7GasActive
GEN-2023-077Not reported255GasActive
GEN-2023-078Not reported255GasActive
GEN-2024-242Not reported250BatteryActive
GEN-2020-002Not reported81SolarOperational
GEN-2020-035Not reported424.5GasWithdrawn
GEN-2020-036Not reported303HybridWithdrawn
GEN-2020-040Not reported303GasWithdrawn
GEN-2020-037Not reported56.5GasWithdrawn

6 more on the substation page.

Cass, NE: 23 requests in the SPP queue, 11 active totaling 2,803.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
ClusterDISIS-2024-001; 02 NEBRASKA
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first