SPP request GEN-2021-040

SPP queue ID GEN-2021-040

Queue request GEN-2021-040 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Cass County, NE, according to Berkeley Lab’s queue data file. The filing names OPPD District, Cass County Power Plant Substation, Bus as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2029.

Queue IDGEN-2021-040
Project nameNot reported
Status (as published)Active
SubstationOPPD District, Cass County Power Plant Substation, Bus
Point of interconnectionOPPD District, Cass County Power Plant Substation, 345kV Bus
CountyCass
StateNE
Voltage345 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cass, NE: 23 requests in the SPP queue, 11 active totaling 2,803.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
ClusterDISIS-2021-001; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-04-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.