Substation Scout

Caddo, OK interconnection queue

19 active projects totaling 2,980.9 MW in the SPP queue, plus 16 with terminal status (shown grayed).

19active projects
2,980.9active MW
35total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-128 Not reported 345 690 Gas Active
GEN-2022-126 Not reported 138 305.2 Solar Withdrawn
GEN-2016-091 Not reported 345 303.6 Wind Operational
GEN-2018-048 Not reported 345 300 Solar Active
GEN-2022-132 Not reported 138 300 Battery Withdrawn
GEN-2015-093 Not reported 345 250 Wind Withdrawn
GEN-2023-229 Not reported 138 230 Wind Active
GEN-2023-164 Not reported 345 210 Battery Withdrawn
GEN-2023-165 Not reported 345 210 Battery Withdrawn
GEN-2017-067 Not reported 345 200.3 Solar Withdrawn
GEN-2007-029 Not reported n/r 200 Wind Withdrawn
GEN-2016-095 Not reported 345 200 Wind Operational
GEN-2005-022 Not reported n/r 177 Gas Operational
ERAS-2025-025 Not reported 138 175 Solar Active
GEN-2017-066 Not reported 138 150.8 Solar Withdrawn
GEN-2007-052 Not reported 138 150 Gas Operational
GEN-2023-150 Not reported 138 150 Solar Withdrawn
GEN-2001-035 Not reported n/r 149 Wind Withdrawn
GEN-2011-010 Not reported 345 100.8 Wind Operational
GEN-2002-014 Not reported n/r 100 Wind Withdrawn
GEN-2003-004 Not reported 138 100 Wind Operational
GEN-2003-006 Not reported n/r 100 Wind Withdrawn
GEN-2016-097 Not reported 138 100 Wind Operational
GEN-2021-064 Not reported 138 100 Hybrid Active
GEN-2003-005 Not reported 138 99 Wind Operational
GEN-2023-GR1 Not reported 69 97.5 Gas Active
GEN-2001-014 Not reported 138 94.5 Wind Operational
GEN-2023-GR6 Not reported 138 74.3 Wind Withdrawn
GEN-2018-109 Not reported 345 50 Battery Withdrawn
GEN-2018-098 Not reported 138 40 Battery Withdrawn
GEN-2005-003 Not reported 138 30.6 Wind Operational
GEN-2004-023 Not reported 138 20.6 Wind Operational
GEN-2015-044 Not reported 345 20 Battery Withdrawn
GEN-2011-037 Not reported 138 6.6 Wind Operational
GEN-2014-005 Not reported 345 5.7 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.