Queue request GEN-2003-005 was listed in the SPP interconnection queue at the end of 2025 as a 99 MW wind project in Caddo County, OK, according to Berkeley Lab’s queue data file. The filing names Anadarko - Paradise (Blue Canyon) as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2006.

Queue IDGEN-2003-005
Project nameNot reported
Status (as published)Operational
SubstationAnadarko - Paradise (Blue Canyon)
Point of interconnectionAnadarko - Paradise (Blue Canyon) 138kV
CountyCaddo
StateOK
Voltage138 kV
Capacity99 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2006-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Caddo, OK: 35 requests in the SPP queue, 19 active totaling 2,980.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterICS-2008-001 Prior Queued; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2003-06-05
Operational date2006-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first