SPP request ERAS-2025-025

SPP queue ID ERAS-2025-025

Queue request ERAS-2025-025 was listed in the SPP interconnection queue at the end of 2025 as a 175 MW solar project in Caddo County, OK, according to Berkeley Lab’s queue data file. The filing names Washita Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDERAS-2025-025
Project nameNot reported
Status (as published)Active
SubstationWashita Substation
Point of interconnectionWashita 138kV Substation
CountyCaddo
StateOK
Voltage138 kV
Capacity175 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Caddo, OK: 35 requests in the SPP queue, 19 active totaling 2,980.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterERAS-2025-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-10-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.