SPP request GEN-2023-GR1

SPP queue ID GEN-2023-GR1

Queue request GEN-2023-GR1 was listed in the SPP interconnection queue at the end of 2025 as a 97.5 MW gas project in Caddo County, OK, according to Berkeley Lab’s queue data file. The filing names Anadarko Power Plant as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2025.

Queue IDGEN-2023-GR1
Project nameNot reported
Status (as published)Active
SubstationAnadarko Power Plant
Point of interconnectionAnadarko Power Plant 69 kV
CountyCaddo
StateOK
Voltage69 kV
Capacity97.5 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Caddo, OK: 35 requests in the SPP queue, 19 active totaling 2,980.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterReplacement; 04 SOUTHEAST
Interconnection serviceERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2023-01-09
Operational date2025-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.