West Millersport substation interconnection queue
1 active project totaling 375 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name West Millersport as the point of interconnection, all in Fairfield County, OH.
Target commercial operation dates as filed run from Dec 2023 to Sep 2030 (4 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1780 | West Millersport 345 kV | 345 | 375 | Battery | Active | Sep 2030 |
| AG1-163 | Ripley Solar II | 138 | 42 | Solar | Withdrawn | Dec 2027 |
| AH1-032 | West Millersport 138 kV | 138 | 10.8 | Solar | Withdrawn | Dec 2023 |
| AG2-003 | West Millersport 138 kV | 138 | 8.4 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: West Millersport (AEP, 7 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Same name on other Substation Scout pages
Other sources that print a substation named “West Millersport” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- West Millersport: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Fairfield County, OH
- Harrison-Good Hope: 2 active, 85.2 MW of 2 filed