West Caldwell substation interconnection queue

1 active project totalling 0.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-163 West Caldwell 13.2 kV 13.2 0.4 Solar Withdrawn
AB1-021 West Caldwell Solar 13 0.3 Hybrid In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.