West Caldwell substation interconnection queue
1 active project totaling 0.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name West Caldwell as the point of interconnection, all in Essex County, NJ.
Target commercial operation dates as filed run from Dec 2016 to Mar 2020 (2 filings).
1active projects
0.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-163 | West Caldwell 13.2 kV | 13.2 | 0.4 | Solar | Withdrawn | Mar 2020 |
| AB1-021 | West Caldwell Solar | 13 | 0.3 | Hybrid | In Service | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.