Walker substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Walker as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Jul 2023 to Dec 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-280 | Walker 34.5 kV | 34.5 | 6.5 | Solar | Withdrawn | Dec 2023 |
| AH1-111 | Walker 12 kV | 12 | 3 | Solar | Withdrawn | Jul 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Pike County, PA
No other substation in Pike County, PA is named as a point of interconnection in the PJM queue.
Other PJM queue substations in Juniata County, PA
No other substation in Juniata County, PA is named as a point of interconnection in the PJM queue.