Van Arsdell-Mercer Industrial substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD2-072 | Mercer County Solar Project | 69 | 63.8 | Solar | Withdrawn |
| AI2-347 | Van Arsdell-Mercer Industrial 69kV | 69 | 17 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.