Substation Scout

Mercer, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AD2-072 Mercer County Solar Project 69 63.8 Solar Withdrawn
AH1-382 Van Arsdell 69 kV 69 17 Hybrid Withdrawn
AI2-347 Van Arsdell-Mercer Industrial 69kV 69 17 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.