Substation Scout

Sutton Dam substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
U1-075 Sutton Dam n/r 12 Hydro Withdrawn
V3-047 Sutton Dam 69kV 69 9.9 Hydro Withdrawn
W1-080 Sutton Dam n/r 9.9 Hydro Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.