Braxton, WV interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
U1-075 Sutton Dam n/r 12 Hydro Withdrawn
V3-047 Sutton Dam 69kV 69 9.9 Hydro Withdrawn
W1-080 Sutton Dam n/r 9.9 Hydro Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.