Sullivan-Rockport substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).

5 PJM queue filings name Sullivan-Rockport as the point of interconnection, all in Sullivan County, IN.

Target commercial operation dates as filed run from Jun 2023 to Jun 2024 (5 filings).

Transmission owner as filed: AEP (4 filings).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-522 Sullivan-Rockport 765 kV 765 180 Solar Withdrawn Jun 2023
AG1-523 Sullivan-Rockport 765 kV 765 180 Solar Withdrawn Jun 2023
AG1-524 Sullivan-Rockport 765 kV 765 180 Solar Withdrawn Jun 2023
AG1-525 Sullivan-Rockport 765 kV 765 180 Solar Withdrawn Jun 2023
AG2-683 Sullivan-Rockport 765 kV 765 180 Solar Withdrawn Jun 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sullivan County, IN

All 19 PJM queue filings in Sullivan County, IN.