Sullivan-Rockport substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-522 | Sullivan-Rockport 765 kV | 765 | 180 | Solar | Withdrawn |
| AG1-523 | Sullivan-Rockport 765 kV | 765 | 180 | Solar | Withdrawn |
| AG1-524 | Sullivan-Rockport 765 kV | 765 | 180 | Solar | Withdrawn |
| AG1-525 | Sullivan-Rockport 765 kV | 765 | 180 | Solar | Withdrawn |
| AG2-683 | Sullivan-Rockport 765 kV | 765 | 180 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.