0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-321 Stryker-Ridgeville 138 kV 138 88.8 Solar Withdrawn
AG1-056 Stryker-Ridgeville 138 kV 138 32.4 Solar Withdrawn