Williams, OH interconnection queue
1 active project totalling 29.4 MW in the PJM queue, plus 6 with terminal status (shown greyed).
1active projects
29.4active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-764 | Not reported | n/r | 148 | Hybrid | Withdrawn |
| AF2-321 | Stryker-Ridgeville 138 kV | 138 | 88.8 | Solar | Withdrawn |
| AG1-056 | Stryker-Ridgeville 138 kV | 138 | 32.4 | Solar | Withdrawn |
| AE2-181 | Montpelier Solar | 69 | 29.4 | Solar | In Service |
| AI2-221 | Snyder 69 kV II | 69 | 17.7 | Solar | Withdrawn |
| AG2-377 | West Unity – Exit 2/Holiday City Tap 69 kV | 69 | 13.5 | Solar | Withdrawn |
| AF2-386 | Bryan 69 kV | 69 | 6.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.