Substation Scout

Shingletown-Lewistown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-473 Shingletown-Lewistown 230 kV 230 32.3 Hybrid Withdrawn
AG2-590 Shingletown-Lewistown 230 kV 230 22.9 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.