Huntingdon, PA interconnection queue

2 active projects totalling 24 MW in the PJM queue, plus 9 with terminal status (shown greyed).

2active projects
24active MW
11total filed
Queue IDProjectkVMWResourceStatus
AG1-473 Shingletown-Lewistown 230 kV 230 32.3 Hybrid Withdrawn
AG2-590 Shingletown-Lewistown 230 kV 230 22.9 Hybrid Withdrawn
AE2-117 HU-Pauls 46 12 Solar Suspended
AE2-118 HU-Logging 46 12 Solar Engineering and Procurement
AF1-138 Huntingdon-Warrier Ridge 46 kV 46 12 Solar Withdrawn
AF2-146 Hill Valley-Valley REC 46 kV 46 12 Solar Withdrawn
AG1-301 Scarecrow Solar 46 12 Solar Withdrawn
AF2-148 Shade Gap-Three Springs KTS 23 kV 23 8.1 Solar Withdrawn
AG2-334 Miller REC - Warrior Ridge 46 kV 46 6 Solar Withdrawn
AG2-205 Bonney Forge 23 kV 23 3.7 Solar Withdrawn
U2-086 Airydale 500kV 500 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.