Pontiac Midpoint-Reynolds substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W1-030 Pontiac Midpoint-Reynolds 345kV 345 39 Wind Withdrawn
W1-031 Pontiac Midpoint-Reynolds 345kV 345 39 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.