Ford, IL interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W1-030 | Pontiac Midpoint-Reynolds 345kV | 345 | 39 | Wind | Withdrawn |
| W1-031 | Pontiac Midpoint-Reynolds 345kV | 345 | 39 | Wind | Withdrawn |
| U4-010 | Pontiac-Latham 345kV | 345 | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.