Point Lookout substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Point Lookout as the point of interconnection, all in Grayson County, VA.

Target commercial operation dates as filed run from Mar 2025 to Mar 2033 (3 filings).

Transmission owner as filed: AEP (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1342 Point Lookout 69 kV 69 44 Wind Withdrawn Mar 2033
AG1-509 Point Lookout 69 kV 69 15.5 Wind Withdrawn Mar 2025
AG1-508 Fiddlers Ridge Wind Facility 69 9.3 Wind Withdrawn Jun 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05C01-1342Terminal status44 Active → Withdrawn

Other PJM queue substations in Grayson County, VA

No other substation in Grayson County, VA is named as a point of interconnection in the PJM queue.

All 4 PJM queue filings in Grayson County, VA.