Grayson, VA interconnection queue

2 active projects totalling 49.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
49.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1342 Point Lookout 69 kV 69 44 Wind Active
AG1-509 Point Lookout 69 kV 69 15.5 Wind Withdrawn
AG1-508 Fiddlers Ridge Wind Facility 69 9.3 Wind Withdrawn
O31 Fries Hydorelectric Plant 12 5.2 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.