Substation Scout

Grayson, VA interconnection queue

1 active project totalling 5.2 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
5.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1342 Point Lookout 69 kV 69 44 Wind Withdrawn
AG1-509 Point Lookout 69 kV 69 15.5 Wind Withdrawn
AG1-508 Fiddlers Ridge Wind Facility 69 9.3 Wind Withdrawn
O31 Fries Hydorelectric Plant 12 5.2 Hydro In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.