Perry substation interconnection queue

2 active projects totaling 229 MW in the PJM queue.

2 PJM queue filings name Perry as the point of interconnection, all in Lake County, OH.

Target commercial operation date as filed: Dec 2031 (1 filing). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ATSI (1 filing).

2active projects
229active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1502 Perry 345 kV 345 213 Nuclear Active Dec 2031
W4-004B_AT11 Perry Nuclear Power Plant 345 16 Nuclear In Service n/r

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.