Lake, OH interconnection queue

2 active projects totalling 229 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
229active MW
6total filed
Queue IDProjectkVMWResourceStatus
Y1-035 Eastlake 138kV 138 462 Gas Withdrawn
Y1-036 Eastlake 345kV 345 462 Gas Withdrawn
C01-1502 Perry 345 kV 345 213 Nuclear Active
W4-004B_AT11 Perry Nuclear Power Plant 345 16 Nuclear In Service
AC2-099 Nursery 36kV 36 3 Gas Withdrawn
AB1-115 Lake County Generating Station 13 2.5 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.