North Hampton substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name North Hampton as the point of interconnection, all in Clark County, OH.

Target commercial operation date as filed: Dec 2028 (2 filings).

Transmission owner as filed: ATSI (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-385 North Hampton 69 kV 69 36.5 Solar Withdrawn Dec 2028
AG2-063 North Hampton 69 kV 69 34.5 Solar Withdrawn Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: North Hampton Substation (ATSI, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Clark County, OH

All 9 PJM queue filings in Clark County, OH.